While a lot of it has dried up, there's still a bit of standing water in our "swamp" area. And most of the post holes have drained, except for one. Yay! ~sigh~ Just in time for more rain forecast for late tonight, tomorrow, and Friday. Regional metro weather said this morning that today is only the 4th dry day we've had in the MONTH of May! yikes


Coop - RD installed the trim boards needed to help close up/cover some gaps and I proceeded to caulk the heck out of them (on the outside). I also laid some sticky-backed vinyl tile to the inside floor. This is in effort to help the floor last longer and be a bit easier to clean. I'm not quite finished with those as I have to figure out how to get the corners and end pieces to fit in around the obstructions. I miscounted when I bought them and was one short for the laying boxes. However, those three aren't sticking anyway so I'm pulling them.
I used up the last of the primer on the new items installed. Items to do remaining: finish laying the vinyl tile, figure out how to deal with the light/air gaps at the top of the egg retrieval doors, roosts (build & install), grind off pokey ends of screws on the inside of coop, finish painting, roof material install; then all the stuff needed for fencing; feeders built, waterers hung, litter material, feed bought; HENS bought. Then we're done.







Leave a comment: